Advertisement
If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below.

Home Who's Online Today's Posts HP Calculator CompD Gift Shop Mark Forums Read
Go Back   Competition Diesel.Com - Bringing The BEST Together > The Starting Line > Shop Talk - Tool and Shop Discussion!
Register Members List Timeslips EFI Live Library Invite Your Friends FAQ Calendar Mark Forums Read

Shop Talk - Tool and Shop Discussion! Tool and Shop Discussion!

Closed Thread
 
Thread Tools
Old 05-11-2016, 09:20 PM   #21
BRE
 
BRE's Avatar

Name: BRE
Title: Too Much Time
Status: Not Here
Join Date: May 2010
Location: Southwest MO
Member`s Gallery
Posts: 12,705
That looks way more feasible
__________________
Rick
07 Dodge 3500 - Tow mirrors, silencer ring MIA, Spectra air filter.
Quote:
Originally Posted by jfaulkner View Post
There really is nothing better than OEM. That goes for anything from turbos to boobs.
RIP Dex KCCO
 
Old 05-11-2016, 09:51 PM   #22
JD3020

Name: JD3020
Title: Too Much Time
Status: Not Here
Join Date: May 2011
Location: Farmersville/Dayton, OH
Member`s Gallery
Posts: 384
For sure. I'd be able to build a loft over the right side giving me 400+sqft of storage space, and have damn near 50ft along the back wall for pallet racks, work bench, welders, etc... Probably put the lift in the middle bay, and put a long floor drain where truck+trailer is to be a "wash bay" area. It'd be awesome to wash the truck and trailer inside in the winter.
__________________
Jimmy
'14 F-250 XLT, 54k miles, leveled on 35" Trail Grapplers. Stock for now.
97 F-250 ECLB 7.3/E4OD/4wd, 215k miles: FFD 250/200%'s, built trans.
01 F-450 crew cab, XLT ZF-6 7.3
05 Jeep Liberty diesel, tuned, EGR removed
 
Old 05-11-2016, 09:53 PM   #23
Ram12vcummins

Name: Ram12vcummins
Title: Too Much Time
Status: Not Here
Join Date: Mar 2015
Member`s Gallery
Posts: 1,659
Quote:
Originally Posted by JD3020 View Post
For sure. I'd be able to build a loft over the right side giving me 400+sqft of storage space, and have damn near 50ft along the back wall for pallet racks, work bench, welders, etc... Probably put the lift in the middle bay, and put a long floor drain where truck+trailer is to be a "wash bay" area. It'd be awesome to wash the truck and trailer inside in the winter.

I was thinking the same if I ever built a shop. I would pour a 6" or so high concrete curb with the slab. We have poured plenty the same time as the slab but that will depend on your crews capabilities. But this would avoid any water under wall issues.
 
Old 05-11-2016, 10:39 PM   #24
RDPsmoker
 
RDPsmoker's Avatar

Name: RDPsmoker
Title: OUT TO LUNCH..
Status: Not Here
Join Date: Nov 2010
Location: Casper or Laramie WY
Member`s Gallery
Posts: 1,815
Why not build a little closet outside to have the compressor?wouldnt have to be much but then you wouldn't have to listen to that d$mn thing run!!
__________________
-DUSTIN-
THANKS TO MAXTORQ
95 2500
-DPC
-SUNCOAST
03 3500
-Stock for now
 
Old 05-12-2016, 10:36 AM   #25
Chrisd91
 
Chrisd91's Avatar

Name: Chrisd91
Title: Too Much Time
Status: Not Here
Join Date: Nov 2010
Location: Washington state
Member`s Gallery
Posts: 1,808
Extend the eaves out as far as you can on one side for more covered storage/work space. Can always enclose it later as funds allow.

Whenever I have the chance to build a new shop, it will definitely have a decent sized well sealed clean room with a roll up door for assembly and disassembly without getting all the dirt, debris, and dust from the main shop
__________________
01 2500 RCLB 4x4 p24v in transmission purgatory/perennial neglect

95ish 2500 2wd shorty p.o.s.

'12 3500 SRW CCLB 4x4 golfball
 
Old 05-16-2016, 07:11 PM   #26
JD3020

Name: JD3020
Title: Too Much Time
Status: Not Here
Join Date: May 2011
Location: Farmersville/Dayton, OH
Member`s Gallery
Posts: 384
Had an idea today at lunch. May not be possible at all, not a homebuilder and i haven't had time to look into it at all. Current thought is 40x60, and using basically a 40x15 area for the bathroom, utility room, and a hangout/bar area which would all be sitting on concrete. My new idea is to extend the barn to a 40x80, and doing heated concrete in the 40x60 area. Then instead of spending $$$(13 yards) to pour concrete under the 40x20 "living area", set posts in the center or wherever needed, and build a floor off of them.

Click the image to open in full size.
__________________
Jimmy
'14 F-250 XLT, 54k miles, leveled on 35" Trail Grapplers. Stock for now.
97 F-250 ECLB 7.3/E4OD/4wd, 215k miles: FFD 250/200%'s, built trans.
01 F-450 crew cab, XLT ZF-6 7.3
05 Jeep Liberty diesel, tuned, EGR removed
 
Old 05-17-2016, 05:35 AM   #27
06 DIESEL
 
06 DIESEL's Avatar

Name: 06 DIESEL
Title: Dead Eye Firearms LLC
Status: Not Here
Join Date: Sep 2007
Location: Airville, PA
Member`s Gallery
Posts: 5,122
Speaking from experience for a crew cab long bed truck you need 24' just to park it and close the door behind it. If you want to work on it, pull the motor, etc you need an additional 8' clear. Then you have toolboxes, etc possibly in front of that. My current garage is 24x32 with the doors on the 32' wall so my bays are 24' deep. Not near deep enough and my toolbox is on the side wall. I do not think you are going to be parking a truck and trailer in front of the trucks pulled in and still be able to easily work on them. Maybe for getting them in for a storm, but not work on them with everything in there. Plus add in room for you welder, torch, plasma cutter, engine stands, chop saw, table saw, etc and you are going to be out of room.

I am adding on to mine hopefully this fall, making it taller and the footprint will be 32x60. I am sure that it will still not be big enough but that is all the room I have where it is currently at without tearing down and starting completely over.
__________________
Travis

My rig - 2021 Mega 3500 SRW

My Classic - 79 Chevy Silverado

Quote:
Originally Posted by RonA View Post
Trucks are like women. Sometimes you just need to spend money on them to keep them happy.
 
Old 05-17-2016, 07:45 AM   #28
DISTURBED
 
DISTURBED's Avatar

Name: DISTURBED
Title: YEA WE RIDE THE SHORT BUS
Status: Not Here
Join Date: Nov 2007
Location: Winchester, Va
Member`s Gallery
Posts: 6,417
I'm in the process of finishing my 40'x120' with a 15x60 lean to on the side and I'm already wishing I had gone bigger. The shop is 40x60 with the the lean too on the side and I'm wishing already the shop was 60x60 with the lean too. But that was another $20,000 to make the entire building 60 wide. I'm with these guys. Build it at big as you can afford because it's still going to be to small in the end. Now the good thing about mine is I can always absorb part of the shed and turn it into shop space by moving the back wall In the shop. So I have expandable space and I planned that in when we built this building. Just something you might want to look into
__________________
Thanks, Jeremy

01 CTD Retired sled puller, dedicated "Twin Turbo" tow rig
96 CTD "TOO" Disturbed 3.0 - Built by Disturbed Diesel Performance
96 CTD "The Sickness" 2.6/2.8- Built by Disturbed Diesel Performance
 
Old 05-17-2016, 08:04 AM   #29
zfaylor
 
zfaylor's Avatar

Name: zfaylor
Title: Comp Diesel Sponsor
Status: Not Here
Join Date: Nov 2010
Location: P-TOWN!, Indiana
Member`s Gallery
Posts: 5,024
x2 on spending money on a quality concrete finisher. You have one chance to get it right. Re doing concrete isn't a fun thing.

Put plastic below the concrete to keep the floor from sweating.

Rebar is a cheap way to reinforce it. Buy the plastic pedestals from Lowes to support it. They are amazing. If you do in floor heat you can buy the tubing on amazon for very cheap. If nothing else you can put the tubing in for future use of in floor heat. Put a decent thermal barrier below the tubing and do as many zones as you can bear. Make sure you tie the tubing down and away from rebar. Tubing likes to float in concrete and if it floats to the rebar you could have an issue with getting a hole in the tubing years down the road.

Rent or borrow a laser to do the grade work. It is extremely easy to be off 2-3 inches over a span that large. If you do 4" concrete this means you'll either have 1" of concrete or 2-3" of uneven floor in spots. They are easy and they are accurate. Grade work can cost a pile of money so there is some money saved if you do it yourself.

If you do drains make sure you either have the proper tanks installed or hope any inspectors in the area aren't anal about it. We had to pour concrete in our drains because the tanks are out of date and we had to send pictures to prove they were still blocked for 2 years in a row. Never heard of such a thing until we had this building. Also make your decision on drains when you do the grade work as you will need to factor in fall to maintain a consistent thickness leading to the drain.

If it is the heat of the summer when they pour make sure you nag the finishers about how hot the concrete is. Some places put ice in the mix during the summer and others do not. Remember the cooler and wetter concrete stays the stronger it is in the end. Ask them what slump they are pouring at when they do it as well. Indication of how strong they plan to pour. Many finishers like a larger slump because it is easier to work but in the end you have more pore space from water content and weaker concrete. Again, important for when it is the heat of the summer or when a plant is far away from a job as they cool the mixture they can go overboard on the content of water. I know many may think that is overboard and intrusive but making them aware that you understand what all of that means will force them to do a better job in the end.

Plan to add in the cost of a pump truck if the walls are up when you pour. Not a bad idea to have it pumped anyways as oftentimes the trucks leave ruts where they are pouring so you end up under estimating concrete needed for the job as well.
__________________
2015 half ton heavy chevy
81 Fairmont LS project
Many yard ornament projects...

North American Turbo

Last edited by zfaylor; 05-17-2016 at 08:06 AM.
 
Old 06-20-2016, 10:59 AM   #30
thatguy69
 
thatguy69's Avatar

Name: thatguy69
Title: Too Much Time
Status: Not Here
Join Date: Jul 2011
Location: Mansfield Ohio
Member`s Gallery
Posts: 2,023
I'd say bigger is better.by the time you get some big work benches in there plus your tool boxes etc etc your going to be tight on space. I'd add on a 12 foot lean too

Sent from my SM-N910V using Tapatalk
__________________
1999 Compound 24v Rust Rocket
2008 F350 P24v/Allison
 
Closed Thread

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 06:34 AM.

 


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2006 - 2024, CompetitionDiesel.com
all information found on this site is property of www.competitiondiesel.com