Both ways are acceptable. Commercial we are used to elevating the tubing and it beingbin the cement and then some residential there is a foam with the grooves cut for the tubing to sit right in the foam.
Although I would have rolled the poly out first then the foam then the tubing. I wouldn't have dropped the poly on last.