Advertisement
If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below.

Home Who's Online Today's Posts HP Calculator CompD Gift Shop Mark Forums Read
Go Back   Competition Diesel.Com - Bringing The BEST Together > The Starting Line > Shop Talk - Tool and Shop Discussion!
Register Members List Timeslips EFI Live Library Invite Your Friends FAQ Calendar

Shop Talk - Tool and Shop Discussion! Tool and Shop Discussion!

Closed Thread
 
Thread Tools
Old 11-23-2015, 07:03 PM   #41
zstroken
 
zstroken's Avatar

Name: zstroken
Title: For $$$ your name here
Status: Not Here
Join Date: Sep 2006
Location: Western Michigan(by the lake)
Member`s Gallery
Posts: 23,151
Quote:
Originally Posted by jfaulkner View Post
Buddy found the best thing to do is take the filter system that came with his clean burn and throw it in the trash. I have geothermal at home. Def the way to go if you can swallow the initial cost.

Just finished putting in a GEO, curious to see how it works. We did the vertical loops and even added an extra loop to help keep us off of the emergency heat.
__________________
2008 4x4 Megacab, 68RFE
97 Dodge gone....
24V P-Pump Mafia member #1(retired)

Thanks to Mumau Diesel, Goerend Transmission, Northeast Diesel Service!
 
Old 11-27-2015, 09:35 PM   #42
jfaulkner
 
jfaulkner's Avatar

Name: jfaulkner
Title: Douche Hunter
Status: Not Here
Join Date: Sep 2007
Location: Ohio
Member`s Gallery
Posts: 5,864
Quote:
Originally Posted by zstroken View Post
Just finished putting in a GEO, curious to see how it works. We did the vertical loops and even added an extra loop to help keep us off of the emergency heat.

I love mine. Buries anything else for cost to run. Highest electric bill I've seen in 7 yrs was $369. That's heating 3200 sq ft maintaining 70* year round and a wife and kids that never turn lights off, 2hp pond fountain running 24/7 and outside lights.. I did horizontal loops because I had the space.
__________________
Quote:
Originally Posted by StainlessRRA View Post
Flipping your mirrors up when you don't tow? That serves no purpose other than to let me know that you are a douche, from a distance.
 
Old 12-01-2015, 02:37 PM   #43
DISTURBED
 
DISTURBED's Avatar

Name: DISTURBED
Title: YEA WE RIDE THE SHORT BUS
Status: Not Here
Join Date: Nov 2007
Location: Winchester, Va
Member`s Gallery
Posts: 6,417
Anyone on here know anything about gas boilers? I got a quote for one and it's pretty high. $14,000for the boiler and install. The company that put the tube in won't give me the specs so I can research them myself
__________________
Thanks, Jeremy

01 CTD Retired sled puller, dedicated "Twin Turbo" tow rig
96 CTD "TOO" Disturbed 3.0 - Built by Disturbed Diesel Performance
96 CTD "The Sickness" 2.6/2.8- Built by Disturbed Diesel Performance
 
Old 12-01-2015, 04:12 PM   #44
Signature600
 
Signature600's Avatar

Name: Signature600
Title: THA MAN!
Status: Not Here
Join Date: Aug 2006
Location: Jeffersonville, Ohio
Member`s Gallery
Posts: 11,975
Damn...mine was $7800 or so for the boiler 3 years ago. Don't remember install, but we spent $150K with the plumbers for the rest of the building, so didn't matter.

What are you pricing?
Chris
__________________


THANKS TO:
Tim Barber @ TRE Diesel
Jeff Mumau @ Mumau Diesel Service
Rip @ Source Automotive
Don Thuren @ ThurenFab Suspension
Columbus Diesel Supply

 
Old 12-01-2015, 04:16 PM   #45
jfaulkner
 
jfaulkner's Avatar

Name: jfaulkner
Title: Douche Hunter
Status: Not Here
Join Date: Sep 2007
Location: Ohio
Member`s Gallery
Posts: 5,864
Quote:
Originally Posted by DISTURBED View Post
Anyone on here know anything about gas boilers? I got a quote for one and it's pretty high. $14,000for the boiler and install. The company that put the tube in won't give me the specs so I can research them myself
I don't have any idea how large of a unit you would need. I see something like the Vitodens 100 is about $7k. Might depend if your planning on leaving the temp alone, guys who constantly turn them up and down every evening would need bigger to recover. Some guys use standard water heaters but they leave their fingers off the thermostats.
__________________
Quote:
Originally Posted by StainlessRRA View Post
Flipping your mirrors up when you don't tow? That serves no purpose other than to let me know that you are a douche, from a distance.
 
Old 12-01-2015, 05:03 PM   #46
zstroken
 
zstroken's Avatar

Name: zstroken
Title: For $$$ your name here
Status: Not Here
Join Date: Sep 2006
Location: Western Michigan(by the lake)
Member`s Gallery
Posts: 23,151
I don't think 14K is too far out. I know cheap residential ones for a house run in the $2k-$3k range just for the boiler.
__________________
2008 4x4 Megacab, 68RFE
97 Dodge gone....
24V P-Pump Mafia member #1(retired)

Thanks to Mumau Diesel, Goerend Transmission, Northeast Diesel Service!
 
Old 12-01-2015, 05:29 PM   #47
DISTURBED
 
DISTURBED's Avatar

Name: DISTURBED
Title: YEA WE RIDE THE SHORT BUS
Status: Not Here
Join Date: Nov 2007
Location: Winchester, Va
Member`s Gallery
Posts: 6,417
http://triangletube.com/TriangleTube...?CatID=1&PID=1

This is what they just sent me. Need to Google and see what kind of money they are
__________________
Thanks, Jeremy

01 CTD Retired sled puller, dedicated "Twin Turbo" tow rig
96 CTD "TOO" Disturbed 3.0 - Built by Disturbed Diesel Performance
96 CTD "The Sickness" 2.6/2.8- Built by Disturbed Diesel Performance
 
Old 12-01-2015, 05:32 PM   #48
Signature600
 
Signature600's Avatar

Name: Signature600
Title: THA MAN!
Status: Not Here
Join Date: Aug 2006
Location: Jeffersonville, Ohio
Member`s Gallery
Posts: 11,975
Laars Neotherm 210K BTU

Here's a smaller version of what I have...first place I found online.

If you like, I can get you in touch with my plumbers that did mine, and I'm sure they would be glad to help you out. They're a local small place here that has been AWESOME for me.

Chris
__________________


THANKS TO:
Tim Barber @ TRE Diesel
Jeff Mumau @ Mumau Diesel Service
Rip @ Source Automotive
Don Thuren @ ThurenFab Suspension
Columbus Diesel Supply

 
Old 12-01-2015, 05:38 PM   #49
DISTURBED
 
DISTURBED's Avatar

Name: DISTURBED
Title: YEA WE RIDE THE SHORT BUS
Status: Not Here
Join Date: Nov 2007
Location: Winchester, Va
Member`s Gallery
Posts: 6,417
Quote:
Originally Posted by Signature600 View Post
Laars Neotherm 210K BTU

Here's a smaller version of what I have...first place I found online.

If you like, I can get you in touch with my plumbers that did mine, and I'm sure they would be glad to help you out. They're a local small place here that has been AWESOME for me.

Chris
I'm open to talking to anyone about these because I have no experience what so ever with them. The link they sent me the most expensive one is $7600 and is 400,000btu. So figuring that where would the other $6400 come into play besides labor
__________________
Thanks, Jeremy

01 CTD Retired sled puller, dedicated "Twin Turbo" tow rig
96 CTD "TOO" Disturbed 3.0 - Built by Disturbed Diesel Performance
96 CTD "The Sickness" 2.6/2.8- Built by Disturbed Diesel Performance
 
Old 12-01-2015, 05:52 PM   #50
zstroken
 
zstroken's Avatar

Name: zstroken
Title: For $$$ your name here
Status: Not Here
Join Date: Sep 2006
Location: Western Michigan(by the lake)
Member`s Gallery
Posts: 23,151
Quote:
Originally Posted by DISTURBED View Post
I'm open to talking to anyone about these because I have no experience what so ever with them. The link they sent me the most expensive one is $7600 and is 400,000btu. So figuring that where would the other $6400 come into play besides labor

Are you doing infloor heat with this?
__________________
2008 4x4 Megacab, 68RFE
97 Dodge gone....
24V P-Pump Mafia member #1(retired)

Thanks to Mumau Diesel, Goerend Transmission, Northeast Diesel Service!
 
Old 12-01-2015, 06:02 PM   #51
DISTURBED
 
DISTURBED's Avatar

Name: DISTURBED
Title: YEA WE RIDE THE SHORT BUS
Status: Not Here
Join Date: Nov 2007
Location: Winchester, Va
Member`s Gallery
Posts: 6,417
Quote:
Originally Posted by zstroken View Post
Are you doing infloor heat with this?
Yea tubing is already in the concrete
__________________
Thanks, Jeremy

01 CTD Retired sled puller, dedicated "Twin Turbo" tow rig
96 CTD "TOO" Disturbed 3.0 - Built by Disturbed Diesel Performance
96 CTD "The Sickness" 2.6/2.8- Built by Disturbed Diesel Performance
 
Old 12-01-2015, 06:10 PM   #52
zstroken
 
zstroken's Avatar

Name: zstroken
Title: For $$$ your name here
Status: Not Here
Join Date: Sep 2006
Location: Western Michigan(by the lake)
Member`s Gallery
Posts: 23,151
Wonder what list price is on the boiler?
__________________
2008 4x4 Megacab, 68RFE
97 Dodge gone....
24V P-Pump Mafia member #1(retired)

Thanks to Mumau Diesel, Goerend Transmission, Northeast Diesel Service!
 
Old 12-01-2015, 06:23 PM   #53
DISTURBED
 
DISTURBED's Avatar

Name: DISTURBED
Title: YEA WE RIDE THE SHORT BUS
Status: Not Here
Join Date: Nov 2007
Location: Winchester, Va
Member`s Gallery
Posts: 6,417
Quote:
Originally Posted by zstroken View Post
Wonder what list price is on the boiler?
From then I have no idea.

http://www.ecomfort.com/Triangle-Tub...iM6hoCkdHw_wcB


This is the biggest one on of that series
__________________
Thanks, Jeremy

01 CTD Retired sled puller, dedicated "Twin Turbo" tow rig
96 CTD "TOO" Disturbed 3.0 - Built by Disturbed Diesel Performance
96 CTD "The Sickness" 2.6/2.8- Built by Disturbed Diesel Performance

Last edited by DISTURBED; 12-01-2015 at 06:25 PM.
 
Old 12-01-2015, 06:35 PM   #54
zstroken
 
zstroken's Avatar

Name: zstroken
Title: For $$$ your name here
Status: Not Here
Join Date: Sep 2006
Location: Western Michigan(by the lake)
Member`s Gallery
Posts: 23,151
Quote:
Originally Posted by DISTURBED View Post
From then I have no idea.

http://www.ecomfort.com/Triangle-Tub...iM6hoCkdHw_wcB


This is the biggest one on of that series

Correct, but if you figure they charge MSRP, or at least mark up the equipment, and if you figure running a gas line, vent line, electrical, final connections, etc. I could see 4 man days for installation cover call back etc.
__________________
2008 4x4 Megacab, 68RFE
97 Dodge gone....
24V P-Pump Mafia member #1(retired)

Thanks to Mumau Diesel, Goerend Transmission, Northeast Diesel Service!
 
Old 12-01-2015, 06:40 PM   #55
Signature600
 
Signature600's Avatar

Name: Signature600
Title: THA MAN!
Status: Not Here
Join Date: Aug 2006
Location: Jeffersonville, Ohio
Member`s Gallery
Posts: 11,975
5700 sq ft to heat....you already said you have a good insulation plan.

Looks like I saw insulation board under the slab??

How is the rest of the floor plumbing laid out? Assuming it's runs are kept as short as possible with a 120' long building, with 5/8" PEX in the floor, I don't know why a ~200K BTU boiler wouldn't be enough.

I am heating 20K sq foot on a 375K, half the slab is not insulated underneath, and the only times I need a bit more boiler is when it's 0* for days on end with zero sunshine.


http://www.wellertech.com is the plumber I use. I'd be glad to give them a call and see if they'd be willing to chat with you and help you make sure your local guy is up to par.

FYI, my old shop is 60x80x16, uninsulated slab, and we were heating it with an inefficient 200K used oil boiler. No problems.

Chris
__________________


THANKS TO:
Tim Barber @ TRE Diesel
Jeff Mumau @ Mumau Diesel Service
Rip @ Source Automotive
Don Thuren @ ThurenFab Suspension
Columbus Diesel Supply

 
Old 12-01-2015, 07:24 PM   #56
DISTURBED
 
DISTURBED's Avatar

Name: DISTURBED
Title: YEA WE RIDE THE SHORT BUS
Status: Not Here
Join Date: Nov 2007
Location: Winchester, Va
Member`s Gallery
Posts: 6,417
Quote:
Originally Posted by zstroken View Post
Correct, but if you figure they charge MSRP, or at least mark up the equipment, and if you figure running a gas line, vent line, electrical, final connections, etc. I could see 4 man days for installation cover call back etc.
Possible, just seems like the numbers aren't jiving to me.
Quote:
Originally Posted by Signature600 View Post
5700 sq ft to heat....you already said you have a good insulation plan.

Looks like I saw insulation board under the slab??

How is the rest of the floor plumbing laid out? Assuming it's runs are kept as short as possible with a 120' long building, with 5/8" PEX in the floor, I don't know why a ~200K BTU boiler wouldn't be enough.

I am heating 20K sq foot on a 375K, half the slab is not insulated underneath, and the only times I need a bit more boiler is when it's 0* for days on end with zero sunshine.


http://www.wellertech.com is the plumber I use. I'd be glad to give them a call and see if they'd be willing to chat with you and help you make sure your local guy is up to par.

FYI, my old shop is 60x80x16, uninsulated slab, and we were heating it with an inefficient 200K used oil boiler. No problems.

Chris
The pad is only 55x60. 60' of the 120' is just a shed with no concrete. Yes it does have 2" foam board under the tube at 300' loops. They had told me before the boiler would be around $4800 or so. So I'm trying to figure out what the rest of the money is going to.
__________________
Thanks, Jeremy

01 CTD Retired sled puller, dedicated "Twin Turbo" tow rig
96 CTD "TOO" Disturbed 3.0 - Built by Disturbed Diesel Performance
96 CTD "The Sickness" 2.6/2.8- Built by Disturbed Diesel Performance
 
Old 12-02-2015, 07:05 AM   #57
Signature600
 
Signature600's Avatar

Name: Signature600
Title: THA MAN!
Status: Not Here
Join Date: Aug 2006
Location: Jeffersonville, Ohio
Member`s Gallery
Posts: 11,975
Quote:
Originally Posted by DISTURBED View Post
Possible, just seems like the numbers aren't jiving to me.


The pad is only 55x60. 60' of the 120' is just a shed with no concrete. Yes it does have 2" foam board under the tube at 300' loops. They had told me before the boiler would be around $4800 or so. So I'm trying to figure out what the rest of the money is going to.
Then I would think a 200K would be PLENTY of boiler, which would make since with the $4800 price.

If the manifolding is all done already, and the boiler just needs installed, plumbed, and powered, then I have no idea where the other $11K is coming from. Maybe 2 days plumbing, one day on power, and another couple days max to get gas to it. At $100/hr that's $4K, and I don't know many plumbers that can get $100/hr around here.

Chris
__________________


THANKS TO:
Tim Barber @ TRE Diesel
Jeff Mumau @ Mumau Diesel Service
Rip @ Source Automotive
Don Thuren @ ThurenFab Suspension
Columbus Diesel Supply

 
Old 12-02-2015, 07:15 AM   #58
zstroken
 
zstroken's Avatar

Name: zstroken
Title: For $$$ your name here
Status: Not Here
Join Date: Sep 2006
Location: Western Michigan(by the lake)
Member`s Gallery
Posts: 23,151
Quote:
Originally Posted by Signature600 View Post
Then I would think a 200K would be PLENTY of boiler, which would make since with the $4800 price.

If the manifolding is all done already, and the boiler just needs installed, plumbed, and powered, then I have no idea where the other $11K is coming from. Maybe 2 days plumbing, one day on power, and another couple days max to get gas to it. At $100/hr that's $4K, and I don't know many plumbers that can get $100/hr around here.

Chris

If they are like some of the HVAC contractors I talked to when doing my GEO, they basically charger MSRP on the equipment and then mark up everything else .
__________________
2008 4x4 Megacab, 68RFE
97 Dodge gone....
24V P-Pump Mafia member #1(retired)

Thanks to Mumau Diesel, Goerend Transmission, Northeast Diesel Service!
 
Old 12-02-2015, 08:28 AM   #59
DISTURBED
 
DISTURBED's Avatar

Name: DISTURBED
Title: YEA WE RIDE THE SHORT BUS
Status: Not Here
Join Date: Nov 2007
Location: Winchester, Va
Member`s Gallery
Posts: 6,417
Quote:
Originally Posted by Signature600 View Post
Then I would think a 200K would be PLENTY of boiler, which would make since with the $4800 price.

If the manifolding is all done already, and the boiler just needs installed, plumbed, and powered, then I have no idea where the other $11K is coming from. Maybe 2 days plumbing, one day on power, and another couple days max to get gas to it. At $100/hr that's $4K, and I don't know many plumbers that can get $100/hr around here.

Chris
Im wondering if they didn't mess the quote up and combine the tubing in the floor and the boiler. $8600 for the tubing and install and $4800 for the boiler and the rest for install. They told me the price did not include the tank.
__________________
Thanks, Jeremy

01 CTD Retired sled puller, dedicated "Twin Turbo" tow rig
96 CTD "TOO" Disturbed 3.0 - Built by Disturbed Diesel Performance
96 CTD "The Sickness" 2.6/2.8- Built by Disturbed Diesel Performance
 
Old 12-02-2015, 08:58 AM   #60
Signature600
 
Signature600's Avatar

Name: Signature600
Title: THA MAN!
Status: Not Here
Join Date: Aug 2006
Location: Jeffersonville, Ohio
Member`s Gallery
Posts: 11,975
That could be. Would make sense.
Chris
__________________


THANKS TO:
Tim Barber @ TRE Diesel
Jeff Mumau @ Mumau Diesel Service
Rip @ Source Automotive
Don Thuren @ ThurenFab Suspension
Columbus Diesel Supply

 
Closed Thread


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 07:05 AM.

 


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2006 - 2024, CompetitionDiesel.com
all information found on this site is property of www.competitiondiesel.com