New shop 60x72x16

Depends on what you call finished?
Using $25-$30 per sq ft number I have seen used on the garage journal forum, you would be in the ballpark of $60 - $72k.

Shop looks good so far. Looking forward to finished pics.

Is that figure having a contractor doing everything start to finish?
 
Im in to this one 96k so far ill have more pics this weekend. Havent done anything on it since dec.

id say ill have an easy 160-190k all said and done.

Hanging lights and fans this weekend will have many more pics after this weekend
 
Not trying to steal this thread, bit could anyone ballpark a 60x40x16 shop cost? Finished, wired, etc...

Sent from phone

We just signed a contract with national barn for a 40x60x16 With a 15x60 lean too on both 60' side for $38k. no electric or concrete.
 
We just signed a contract with national barn for a 40x60x16 With a 15x60 lean too on both 60' side for $38k. no electric or concrete.

I've been pricing 40x64x14's for this year and it's hit and miss around here...ranging anywhere from 40-65k for a building built, lined and insulated. Bigger names like Wick, Morton, FBI, Cleary are all on the high end.

Add concrete, lighting, heat, etc. and it'll keep adding up.

Even the local contractors that build Menards buildings want $5-7sq ft for putting them up.
 
Lights and fans
 

Attachments

  • image.jpg
    image.jpg
    47.4 KB · Views: 0
Last edited:
Not trying to steal this thread, bit could anyone ballpark a 60x40x16 shop cost? Finished, wired, etc...

Sent from phone

I'm building a this exact size this summer. I designed it all up my self. Even built my own 6x6 post(can save 75 dollas a post this way). I walked into Menards and said I need x amount of steel this long and x amount of 2x6x10'. Doing it this way I saved about 5k on the price.

I will have 10k into the building in materials and I have 2k into dirt work. Had to bring in 24" of sand as that was how thick the top soil was. I will be doing the concrete floor my self (with some help from freinds) and will have about 4500 into that.

It wont be finished but will be wired.


Very jealous of the OB building nicely done.
 
welcome! did you know they flow more CFM by taking out every other blade?


Yes i did but for now I think i like the look of the six but when we get summer down here i may change my mind into a more of a function over form mind track!
 
Back
Top