SledPuller21
Never enough
- Joined
- Jan 18, 2007
- Messages
- 2,214
All these are less than 6 months old, getting ready for a 12v repower project, could use the spare cash.
-STG 2 II CP3 and dual feed line-$1150
-PPE Dual CP3's-$2400
-EH BFI nozzles. Will make ALOT of power with the right setup-$550 plus good cores.
-TS mp-8 for 06-07 $250.
-PPE 160gph LP(Seriously only used a week)-$200
-Holley Black 140gph LP(2 years old, only used a year)-$75
-STG 2 II CP3 and dual feed line-$1150
-PPE Dual CP3's-$2400
-EH BFI nozzles. Will make ALOT of power with the right setup-$550 plus good cores.
-TS mp-8 for 06-07 $250.
-PPE 160gph LP(Seriously only used a week)-$200
-Holley Black 140gph LP(2 years old, only used a year)-$75