II dual feed line

tirefrier

Coal Train conductor
Joined
Nov 25, 2007
Messages
321
never used. I didnt install it went with a stage 3 cp3 decided to keep the pop off in use. They ask 300 for it on industrials site. Shoot me an offer.
 
Back
Top