JFlagg
Gun for Hire
- Joined
- Jul 27, 2007
- Messages
- 5,630
I've been working on these here and there over the past few weeks, and finally got them done. Their nothing special, just some solid, clean trac bars I built in my garage. The links are 1 1/2"x 1/4' wall tubing with some heim links threaded in the ends, I had a local machine shop thread some inserts for me that I plug welded inside. The lower brackets I made to bolt onto the ends of the U-bolts, but due to my lift I had to buy ones an inch longer, no big deal. The upper mounts are bolted to the frame right at the rear of the transfer case. Overall the bars are 66" long. Only have a few miles on them, but the work good so far. Not sure when I'll get to test them on a sled, but I'll let you know what happens...And unfortunately my pics were too big, so here is the link to see them elsewhere.
http://www.turbodieselregister.com/...st-finished-my-traction-bars.html#post1801999
http://www.turbodieselregister.com/...st-finished-my-traction-bars.html#post1801999