wideopen
Slum Lord
- Joined
- Apr 3, 2006
- Messages
- 20,816
My Saturday Progect actually started last night, after I went by the GM stealership and picked up the 07.5 door badges.
These things look so much better than the stock 03' door badges. BTW I left the 03' Duramax badge on for you non-Duramax members.
Then I started the project I've been putting off due to having to play Mr. Mom in the afternoons for the last 2 weeks.
I installed my new Super Diesel Lift Pump unit, this thing is awesome. It took about 4-5 hours to put it on..but I changed a lot of the stuff on my truck that needed to be done a while ago while I was putting the pump on.
I'll have some more about the pump later this week, but for the mean time here's a pic of this awesome unit.
After I got done with the pump I added one of the things I've been really excited to get on the truck.
The Super Diesel Center link, this think is way stronger than the stock Center link and not much of a challenge to put on . A normal person should be able to put it on in less than an hour in the driveway.
Also there will be more to come on this later this week.
Mike at Super Diesel really has the Pump and Centerlink down to a Science.
These things look so much better than the stock 03' door badges. BTW I left the 03' Duramax badge on for you non-Duramax members.
Then I started the project I've been putting off due to having to play Mr. Mom in the afternoons for the last 2 weeks.
I installed my new Super Diesel Lift Pump unit, this thing is awesome. It took about 4-5 hours to put it on..but I changed a lot of the stuff on my truck that needed to be done a while ago while I was putting the pump on.
I'll have some more about the pump later this week, but for the mean time here's a pic of this awesome unit.
After I got done with the pump I added one of the things I've been really excited to get on the truck.
The Super Diesel Center link, this think is way stronger than the stock Center link and not much of a challenge to put on . A normal person should be able to put it on in less than an hour in the driveway.
Also there will be more to come on this later this week.
Mike at Super Diesel really has the Pump and Centerlink down to a Science.