I apologize for any delay in information. My manufacturer although they make a great product, they don't have the best communication. The dmax springs have been delayed, they will ship in 2 weeks. The 6.0l springs will be shipping in 4 weeks, this is from a problem with a batch of wire they got from kobe steel. Due to the design of the 6.0 springs with finish on the wire, the springs were fracturing during the coil process. Although I want these springs now, I don't want to sacrifice quality. I apologize for the inconvenience. When I pass the manufacturers lead times on to you sometimes they change and I can look like a liar. This is one of those instances. I will keep you updated.
Zach