Hey guys maybe some insight that could help me. So was installing my dual fuelers tonight hit a few snags. First one was with the fleece coolant bypass the coal ant neck doesn’t line up with the hard pipe from ppe. Second snag was trucks a 04.5 but doesn’t have the kick down cable relocation bracket for trans and one run into this issue either? Any help would be greatly appreciated.