S300/s400 twin turbos

cummins939

New member
Joined
Aug 17, 2009
Messages
636
up top is a s360/68/.91 t4 over a s475/92/1.10. s300 has probably 2000 miles and s400 has around 6000. both are tight, zero in and out play, i just built them a few weeks ago. spools around 1000rpm on a brake boost and will keep 1psi after you let off untill you let off brake, they spool amazing. comes with..

stainless diesel t4 manifold
s300
s400
both oil feed lines
both oil drains
k&n air filter
all boots and clamps (best boots you can buy with kit)
intercooler pipe,charge pipe,hotpipe,downpipe, exhaust clamps
everything is there!

asking $3600 shipped

This image has been resized. Click this bar to view the full image.

Report this image

This image has been resized. Click this bar to view the full image.

Report this image

This image has been resized. Click this bar to view the full image.

Report this image

This image has been resized. Click this bar to view the full image.
 
03CB4A15-7F9A-4B58-8C97-B140B0BD7F57-702-000000F1D938D472.jpg

FB21193D-63E8-44DC-8110-9404CEA4E3F8-702-000000F1F31CBA45.jpg

8FAA9F43-6F15-45C9-8525-5F67BC775CC6-702-000000F2077D1CD3.jpg

C2E9C968-336F-461F-BD29-CAEDCC371F9C-702-000000F21C561AB4.jpg
 
No just want to keep whole kit together, thanks anyway.

I've just always heat wrapped my piping, I think it looks nicer than paint,jmo.
 
what state are you from ? i'm new to this ,but how much does it cost to duplicate this kit ? i see some new stuff on ebay kinda cheap . was this a kit or did you make the pipes and etc yourself ? and how long does it take to install one of these kits ? thanks .
 
I'm in Columbus Ohio, it cost a bit more than what I have it listed for and it takes a few days to build if you really do a quality job.. I drove the truck after 3 days but I worked on them here and there for a week or so. I made everything you see, all pipes , flanges on pipes, hardware, oil lines, downpipe, everything is somthing I (abrahamdieselperformance) built. Install isn't bad because it simply bolts/clamps together. I made the downpipe adjustable too in 3 places, it's really self explanatory and simple! Hope this helps!
Riley.
 
i've been to national trails dragstrip there ,a freind of mine had a bike shop there and built lots of street/dragbikes . when you say easy install ? 4 hrs 6,8 or more ? 06 dodge 2wd dually ?
 
you will probably have 1-2 hours in taking all your stuff off including manifold.. and probably 4 putting all this stuff on.. call it 8 hours after you stop and eat, and maybe take a few breaks. thats taking your time making sure clamps line up and everything is perfect
 
Not separating anything. Kit needs manifold to bolt up perfectly. I have too much time and money in these to have someone piece them together on the wrong manifold. This product was designed perfectly and I intend to sell it that way!

Riley.
 
Is there a down side to having that filter tucked way down in there? get enough cool air in your opinion?
 
Back
Top