How is everyone running their 3 way valve with dual feeds? I was thinking -10 from the cell to my inline 100micron screen, to waterman, to filter head, then have two -8s going to the pump.
The problem is you'd have to have run your dump valve before you split to the 2 smaller lines. The dump valve came with -8 fittings.
Unless someone has a better idea I'll probably run -8 out of the filter head, into the dump valve, split to dual feed with a y after the dump valve.
I'm also going to use a -4 primer pump near the cell with a check valve.