Before......&......after....

I'm not coating anything until I know how this works out.
Should I leave it black when the time comes for coatings, or chrome it, or?

What do you think of the "12 rounds" brackets?
If I chrome this pipe, I will change the casings to burgundy, or orange...idk?

image-54.jpg
 
Looking at your engine bay I am hard time seeing your hpop setup.
Do you have a setup like Ellertons?
 
Little update:
Sent all the piping, not just the new stuff, all out to be ceramic coated.
Everything from the new manifolds up to, and including the turbine housing, will be Titanium green coated. (Highest temperature coating they have.)
Everything else will be High Lustre. (Close to chrome)

Still waiting on both turbos to come back yet...

Trying to find a spot to mount the AMS-1000. (I found an old sticky back mount that came with the old Edge with Attitude I had years ago.)
USPS lost the new wiring harness and pig tails I ordered for the AMS-1000...so they are currently "In-Transit"

Transmission cooler fan relocate all done, and refilled.

Radiator was professionally washed inside and out.

Gonna cut a plate out of aluminum for the boost controller to mount against.

Only like 40 days left before the track opens again....tick-tock, tick-tock.
 
Last edited:
Castrol opens on the 25th if u feel like driving up to Edmonton.

April 25th is my 22nd anniversary...also the day all the piping is gonna be done, and the same day we are taking our kids, and their friends to Comicon in Calgary.

I took some vacation time in May for my sons 16th birthday, and to hopefully get the truck running again.

FI said my turbos should have only taken a couple days...on the 12th of March, it will have been a month.:bs:
 
Put the rest of the little pieces back onto the brackets.
I was starting to make some brass pieces to fit...but it's gonna take some time I don't have right now...just wanna get it finished up, and driving again.

imagejpg1-12.jpg
 
Back
Top