Power hooked back up. Spoken to the guys about 3ph for the property looks like 240v will be the easiest.
Hung the door frames, added some braces, and moving dirt for the ramp needed to access the building. Hoping to pour this weekend. Going to add a little side walk from the ramp to the walk through door being the area will be nothing but dirt for the next few years. 20” difference in elevation from existing driveway to the shop slab. This ramp is temporary permanent.
Packing the dirt with my 12v. Everyone should have a 12v around.
Hung the door frames, added some braces, and moving dirt for the ramp needed to access the building. Hoping to pour this weekend. Going to add a little side walk from the ramp to the walk through door being the area will be nothing but dirt for the next few years. 20” difference in elevation from existing driveway to the shop slab. This ramp is temporary permanent.
Packing the dirt with my 12v. Everyone should have a 12v around.