On July 3 we had a turbo air shut-off/ shut and hurt the wheel of the turbo. We called Haisley and they recommended sending it to Chris at Engineered Diesel. We sent the turbo and after about 3 weeks we called Chris and he stated he more than likely would have the turbo back by 7/30. We never got it then he promised a couple weeks later that it would be done and he would drop it off with Haisley's at a pull and then they could ship it to us. This never happened as well. It's now 8/20 and we still haven't heard anything and have stopped calling. I just wish someone could be honest with us. When will it be done? We have missed several pulls and we would just like to know what is the honest answer of when it will be done. Thanks