Started on my 40x60x14 this weekend.
Friday picked up all the steel and 2x6x10' along with trusses getting deliverd. Rented a bobcat. Saturday morning the 3 of us got rocking and rolling. By the end of the day we had drilled 20 24" holes 7ft down and got both 60ft wall post in the ground squared up and back filled.
Sunday we finshed the 40ft walls cleaned up and back filled.
4k worth of footings in the bed and another 4k in steel on the trailer. Good thing I only had a mile to go.
How tall would I need to go on my building to have a nice second level inside with fairly average ceilings heights
Nice start. Wouldn't it been a lot cheaper to have a truck come fill the bottoms of the holes instead of 4k dollars of footings?
Maybe it will work now.
My god! I don't know what I'd do with all that room.
Fill it with junk like most people LOL
I swear I thought I built a plenty big enough shop but once I put shelving and tools in it quickly shrank. Now I want bigger after only 6 months.
It is amazing how quickly one can fill up. We built it as a shop, so we are trying to not fill it up with things that just need stored. Very hard to do. But we did take the back corner of it (28x50) and make it a separate room.My god! I don't know what I'd do with all that room.