Cummin_un_glued New member Joined Sep 17, 2007 Messages 785 Aug 5, 2012 #1 how fast before i have to put a cage / roll bar in for the 1/8th i know its 11.49 in the 1/4 but its only 1/8th there
how fast before i have to put a cage / roll bar in for the 1/8th i know its 11.49 in the 1/4 but its only 1/8th there
Cummin_un_glued New member Joined Sep 17, 2007 Messages 785 Aug 6, 2012 #3 Humm how strict they going to be? I guess i can lift early if i dont get it put in. Sent with a Droid RAZR in one hand and 14,000 volts in the other.
Humm how strict they going to be? I guess i can lift early if i dont get it put in. Sent with a Droid RAZR in one hand and 14,000 volts in the other.
Cummin_un_glued New member Joined Sep 17, 2007 Messages 785 Aug 6, 2012 #5 I already have a s&w 10 point cage sitting here just dont know if i will have time to install it. Sent with a Droid RAZR in one hand and 14,000 volts in the other.
I already have a s&w 10 point cage sitting here just dont know if i will have time to install it. Sent with a Droid RAZR in one hand and 14,000 volts in the other.