Well after waiting forever for the machine shop to get things done the motor is finally finish and in the mean time I extended the frame on put a longbox on it since my cousin has a pickup the same color and put a flatbed on. Heres a bunch of pics of the process.
2006 megacab shortbox with 57000 miles and a spun rod bearing.
engine removed
The damages
part of the new parts
putting the main caps back on.
Part of the front gear train.
Head studs installed
Head and exhaust manifold on.
Bout ready to come off engine stand
In pickup with injector harness and what not on.
Transmission washed up
Bout ready to close er up
New bumper ready to go on.
Frame extension
First cuts
The damages complete
Under cab cut
New box off cousins pickup
Little bit of grinding
Cutting out extension pieces
Bending extension channels
Outer channels 1/4" thick
Working on inner frame tubes
Inner extensions complete
2006 megacab shortbox with 57000 miles and a spun rod bearing.
engine removed
The damages
part of the new parts
putting the main caps back on.
Part of the front gear train.
Head studs installed
Head and exhaust manifold on.
Bout ready to come off engine stand
In pickup with injector harness and what not on.
Transmission washed up
Bout ready to close er up
New bumper ready to go on.
Frame extension
First cuts
The damages complete
Under cab cut
New box off cousins pickup
Little bit of grinding
Cutting out extension pieces
Bending extension channels
Outer channels 1/4" thick
Working on inner frame tubes
Inner extensions complete