Been busy and making head way. Dad and future father in law have been busy framing and I’m plumbing all the drains in.
Talked with Smokenrebel about electrical and all set on how to properly wire this place. Need to order electrical stuff today and start wiring next week.
Ordered two Brinno time lapse cameras to capture some of this work. Kind of late to consider this but I’m excited to capture the time lapse of the progress.
Tight plumbing quarters in 2x6 joist bays for 2nd floor toilet. Pic taken from 1st floor bathroom.
Plumbing around a beam support column instead of through it. That’s the handy part about working inside an existing building. Less drilling through studs to run drains. Just take some forward thinking and planning.
Upstairs half bath located directly above downstairs for easier plumbing and venting. Hope to only have one roof penetration for all vents.
2nd floor wall toward the shop. 2’closet door.
Two 3’ French doors here for moving in all the large items up stairs. Plan to use the fork lift instead of the stairs. Once moved in, washer and dryer will be placed behind those doors on the balcony area. Doors open inward.
I didn’t take into account for the middle rafter going through the closet. So we just framed around it.
Another view from inside the closet.
Tied the ceiling to the purloin brace just for grins. Have done this in a few other areas also. Should be a fairly rigid 2nd floor.
View from the walk through door into the shop. Scaffolding needs to be taken down. It’s turning into a mobile work bench.