I hate to make reservations because i dont know if i will make it. I will definately come if the truck is done.
Things i have to finish..
1. All the mounting and plumbing for the twins and wastegate
2. Roll cage
3. Fuel system
4. cam and replace fire ring
5. Trac bars + driveshaft loops
6. PAINT (it looks like a piece of crap and im embarrassed)
If anyone wants to work and doesnt mind, long hours, must be very knowledgable, and not mind being paid with hot dogs and toilet paper, call me.
Its also going to be the first time its run like this too. We may still have snow on the ground in april.
I hope there will be vacancy some where if i wait. Otherwise ill be sleeping in the truck.