Trusted
New member
- Joined
- Feb 9, 2009
- Messages
- 761
I know a lot of you guys don't check out the vendor sections. So, I thought I would post this in here as well.
Trusted Performance was started with the intention of releasing products into the marketplace that make a difference.
Two years ago when we officially launched Trusted Performance we had two major products in mind. After a lot of meetings and discussions, we opted to head down the long development road to come out with a turbocharger that meets the needs of the 6.0L Power Stroke owners. Little did we know that, the 10 month project was going to take almost 24 months.
We started with a blank piece of paper and made a list of everything we wanted in a turbocharger; great throttle response, quick spooling, low back pressure, mount to the factory pedestal, no y-pipe or down pipe adapters ……...
From there, we started gathering performance information on the engine. We tested all sorts of different turbocharger configurations (turbine wheels, turbine housings, compressor wheels, and compressor covers), external wastegates, internal wastegates, different injector sizes, and different tuners and programmers.
With all of that information gathered, we started designing a turbine housing from the ground up. We did not reverse engineer any turbine housing. What we have come up with is something unlike any housing out there. These housings have been designed for the 6.0L Power Stroke engine. We have not taken into account any other engines.
There are many features to our new turbine housing and we will be releasing more information as we get a little closer. Some of the housing features are:
Bolts to the 04-07 factory pedestal
Clamps to the factory y-pipe. No adapters required
Clamps to the factory or aftermarket down pipe. No adapters required
A/R specifically designed for the 6.0L. (A/R(s) to be released at a later time)
The design of the housing has been completed. We are currently machining the core boxes and other pieces needed to cast the housing. We are anticipated the completion of the machining to be done around middle of January and we will start pre-selling turbochargers in February.
More details will be released as we get closer to officially releasing the chargers. Please check periodically with our website http://www.TrustedPerformance.com for future updates……..
Trusted Performance was started with the intention of releasing products into the marketplace that make a difference.
Two years ago when we officially launched Trusted Performance we had two major products in mind. After a lot of meetings and discussions, we opted to head down the long development road to come out with a turbocharger that meets the needs of the 6.0L Power Stroke owners. Little did we know that, the 10 month project was going to take almost 24 months.
We started with a blank piece of paper and made a list of everything we wanted in a turbocharger; great throttle response, quick spooling, low back pressure, mount to the factory pedestal, no y-pipe or down pipe adapters ……...
From there, we started gathering performance information on the engine. We tested all sorts of different turbocharger configurations (turbine wheels, turbine housings, compressor wheels, and compressor covers), external wastegates, internal wastegates, different injector sizes, and different tuners and programmers.
With all of that information gathered, we started designing a turbine housing from the ground up. We did not reverse engineer any turbine housing. What we have come up with is something unlike any housing out there. These housings have been designed for the 6.0L Power Stroke engine. We have not taken into account any other engines.
There are many features to our new turbine housing and we will be releasing more information as we get a little closer. Some of the housing features are:
Bolts to the 04-07 factory pedestal
Clamps to the factory y-pipe. No adapters required
Clamps to the factory or aftermarket down pipe. No adapters required
A/R specifically designed for the 6.0L. (A/R(s) to be released at a later time)
The design of the housing has been completed. We are currently machining the core boxes and other pieces needed to cast the housing. We are anticipated the completion of the machining to be done around middle of January and we will start pre-selling turbochargers in February.
More details will be released as we get closer to officially releasing the chargers. Please check periodically with our website http://www.TrustedPerformance.com for future updates……..