Woohoo--started pre-assembly on my Dynatrac kit!

jvencius

New member
Joined
Dec 16, 2007
Messages
223
So far I haven't done anything too big, but yesterday I installed new studs into the Dynatrac spindles, beat new lug studs into the hubs (1/2 hour with a brass punch and a BFH--easy job), and pressed a new u-joint into the 2nd outer stub shaft. After that, the only pre-assembly I have left is to pack the bearings and install the inner bearing/seal into the hub since everything else will have to be done when I actually do the install. The kit was a wheelbarrow of bucks, for for as well-made a product as it seems to be, it's worth it.
 
Top