Got 'er a little closer to really being ready to go.
Took almost all afternoon to do the fitment at the transition point due to it being a compound angle AND transitioning from 4" to 5". That was one of the worst pipe matings I think I've had to do.
But, still need to finish it up tomorrow. I need to shorten the pipe coming off the upper primary about an inch to get a good mate at the transition. I'll weld in a v-band so it's not one piece and then it's just running the rest of the 5" back to the stack.
Had to MIG this part together....I just didn't have the fitment tight enough to TIG. It'll work..it's just exhaust.
And this is where I'll need to shorten the pipe up top to bring it back slightly so the elbow will line up with the main down pipe. Once I have it lined up I'll v-band it so it's not one big hard to manage pipe. I really should put a 4" flex couple in there, but.....screw it, let 'er roll.