IdahoRob
Comp Diesel Sponsor
- Joined
- Apr 25, 2006
- Messages
- 2,337
working day and night and seem to be in quick sand.
Two days left and need to;
Wire the whole engine/trans
Finish the tranny shields
Plumb the coolant system
Install window net and mounts
Install and mount shifter
Install gauges and sensors
That is just off the top of my head. Will only be running one cp3 pump as the hard lines aren't completed.
Good thing is Max'd Out doesn't need a thing done after the last event. Top off the fuel and off it goes.
Two days left and need to;
Wire the whole engine/trans
Finish the tranny shields
Plumb the coolant system
Install window net and mounts
Install and mount shifter
Install gauges and sensors
That is just off the top of my head. Will only be running one cp3 pump as the hard lines aren't completed.
Good thing is Max'd Out doesn't need a thing done after the last event. Top off the fuel and off it goes.
Last edited: